Rankings of Factor Affecting Formwork Causing Delay in Construction Project By RII Method

Authors

  • Ankit Nileshchandra Patel
  • Dr. Jayeshkumar Pitroda

Keywords:

Formwork, Delay factors, Rankings, RII method, Construction Projects

Abstract

In India most of the construction projects are getting delayed and this has become the most
common problem now a days. Most of the construction projects are heavily influenced by
causes of delay. For successful completion of any project one must know the factors that
affects on delay. There are various reasons for delay in construction project in which
formwork also plays an equally important role. Formwork is use to support structures for
creating structures. Formwork by name means “The Mold” which means it is the casing into
which the casting material, usually concrete, is poured to obtain the desired structural shape.
The various formworks are timber, aluminum, plastic formwork etc. The selection of various
factors has been decided from various literature review and one to one communication.
Questionnaire has been prepared while keeping in mind about different mega projects.
Questionnaire is allocated/distributed to various parties like owner, structural consultants,
contractors and manufacturer, architects for formwork in various parts of Central Gujarat
region. The study by Questionnaire approach will try to reduce inefficiency which will then
cumulate into RII (relative importance index)